
☰

ORVELLAN GROUP
OPINIONS
Infrastructure & Resilience
CLEAR STRATEGY.
SOUND DECISIONS.
PRACTICAL SOLUTIONS.
28 SEPTEMBER 2026 / Infrastructure & Resilience
A Water-Efficient Factory Can Still Be in the Wrong Place
Europe’s latest water initiatives point toward a harder business discipline: assess the catchment, operating capability and competing demands before committing to expansion.
Illustrative photograph by Ivan Bandura / Unsplash.
Opinion · 28 September 2026 · 4 min read
A company can reduce water use per unit of production and still become more exposed to water disruption. Expansion may increase its total demand. The surrounding catchment may face competing needs, deteriorating quality or unreliable infrastructure. Efficiency inside the factory is valuable, but the business ultimately depends on a shared water system. Boards should assess that system before treating a location as suitable for long-term growth.
A European Investment Bank paper published on 22 September makes the wider problem unusually clear. It argues that the main obstacle to stronger water systems is how investments are developed, coordinated and financed, rather than simply a shortage of finance. Projects pursuing narrow objectives can miss the way a river basin functions across sectors and administrative boundaries. EIB, Future-proofing Europe’s water systems, 22 September 2026.
The implication for corporate strategy is substantial. A water plan should explain what the operation needs, what the surrounding system can reliably provide and what happens when those two conditions diverge. A supply agreement is one input to that assessment. It cannot, by itself, establish how the physical system will perform under sustained pressure.
Assess water resilience in the difficult operating period
Annual averages are an inadequate starting point for an operation whose demand peaks during the driest months. Management should examine seasonal requirements, the quality needed for each process, treatment capacity and the consequences of temporary restrictions. A food producer, hotel and industrial cooling system will have different requirements even when located in the same municipality. The analysis must follow the actual operation.
That assessment should extend to the supply chain. A site with modest direct consumption can depend heavily on water-sensitive agricultural inputs or an upstream industrial process. The useful question is where a disruption could prevent delivery to customers. Mapping that dependence can identify a more effective response than pursuing a uniform percentage reduction across every facility.
The first options deserve a disciplined comparison: reduce avoidable use, repair losses, redesign processes, reuse water where appropriate and examine alternative sources. Each option has energy, maintenance, quality and cost implications. Reuse can be valuable, but it needs treatment and monitoring suited to the intended purpose. Describing a project as circular does not establish that it can operate reliably.
Europe’s policy agenda recognises these connected objectives. The Commission’s Water Resilience Strategy implementation tracker combines restoration of the water cycle, a more water-efficient economy, and secure access to affordable drinking water and sanitation. Its range of actions is a policy programme, not evidence that a particular basin has already become resilient. European Commission, Water Resilience Strategy actions tracker.
Budget for the people who keep the system working
Physical investment needs operational capability. On 21 September, the Commission launched the European Water Academy to strengthen knowledge and skills across the sector. The initial training areas include leak detection, wastewater treatment, pipe installation and drinking-water production. The initiative is an acknowledgement that delivery depends on competent people as well as equipment. Joint Research Centre, 21 September 2026.
For a board reviewing a new facility, this should become a practical requirement. Identify who will operate and maintain the water infrastructure, how performance will be measured and whether budgets cover the full operating life. A technically impressive installation can underperform if maintenance is postponed, monitoring is weak or specialist skills are unavailable when needed. Capital approval should include the continuing obligations that make the asset useful.
Public authorities face a related coordination task. Where several users depend on the same system, investment choices should make trade-offs visible and preserve essential household and ecological needs. A private contingency arrangement should not quietly shift disruption onto neighbouring communities. Transparent planning can help establish which improvements serve multiple users and how their costs and responsibilities should be shared.
Companies should translate this analysis into decisions before expansion becomes difficult to reverse. A credible plan might justify a different production schedule, a phased increase in capacity, investment in shared infrastructure or another location. The choice depends on evidence from the specific catchment and operation, with explicit thresholds for revisiting assumptions.
Water resilience is becoming a test of whether commercial plans fit the places in which they will operate. The strongest project is one whose efficiency, infrastructure and operating commitments remain credible when the surrounding system is under pressure. That is the standard against which the next factory, hotel or logistics development should be judged.
Sources reviewed on 28 September 2026. This opinion reflects the evidence available at that date.